Waterford Retirement Village

October 9, 2019

Elegant, spacious, luxury living at its best; Waterford Retirement Village crossed the spectrum of the HVAC industry, bringing a variety of HVAC elements into one complex.


This stunning project in Hobsonville Point, completed in October 2019, is looked upon as a village within a village; whether independent or community living is desired, it’s got

something for everyone. Comprising 30+ apartments and a community lodge with a restaurant/café, bar, wellness centre, private theatre and library, and a heated swimming pool & spa and gym complex, Waterford certainly delivers.


Each apartment has a standalone ventilation and air conditioning system, and all common areas are fully ventilated and air conditioned using a highly energy-efficient Mitsubishi Electric VRF air conditioning system.


The swimming pool area is also fully ventilated with exposed ducting and heated with space radiant wall-mounted hot water heaters in addition to the underfloor heating.


The Basement carpark is fully ventilated with a mechanical extract system to add to the mix.


According to Grant Brosnan, Project Manager for Air Mark Services Ltd (Mechanical Contractor), “There was a lot of diversity and different aspects to this job. It was like a whole lot of jobs intermingled into one project; roof work, louvres on outside walls, fully welded kitchen extracts, and exposed pool ducting, etc.”


“The major benefit of using Express Sheetmetals on a job of this nature is the two facets of their business: supply and manufacture of ductwork and the installation.”


The convenience of the full service is what sets Express Sheetmetals apart, as is one of the biggest in Auckland, providing both product and installation.


“It really takes the workload and pressure off us, and is part of what makes Express Sheetmetals a good go-to company.”


Grant credits Express Sheetmetals for taking constructive criticism, sorting out any issues swiftly, and their direct

communication.


“Sander is very good at smoothing over any issues if there are any. To be fair, over the whole project, we never had a major one”, he explains.


“Successful completion of this project came down to a comprehensive joint team effort between Air Mark Services Ltd and Express Sheetmetals, as we worked through a significant number of emerging architectural details and requirements throughout the project duration. That kind of teamwork highlights the value of a close partnership, and means all parties can share their best ideas and experiences when working through construction challenges on the project”, Sander Dales – Director Operations, Express Sheetmetals.


This project is similar to another retirement village Express completed for Air Mark Services Ltd, a few years ago, Greenwich Gardens – a similar project but at scale, with over 250 apartments.


“I must say Express put into their machinery and development of their products the most than any other company I know; money, time and quality. Most of their machinery comes from Switzerland, and the quality of their ducting and so forth is probably one of the best that I have seen in my career.


We have used thousands of their particular rubber seal products that alleviate the need to apply duct sealant around the duct. Very impressive”, closes Grant.

By Paul Bondsfield June 24, 2026
Discover the 7 most important custom ducting features that improve HVAC efficiency, reduce energy costs, and optimise airflow in commercial buildings.
Production facility capacity is key
By Paul Bondsfield June 23, 2026
Custom steel ducting fabrication guide for commercial HVAC contractors. Learn how to choose reliable ducting suppliers based on cost, lead times and project performance.
Commercial HVAC Installation
By Paul Bondsfield June 19, 2026
How does commercial HVAC installation affect project timelines? Learn the key factors that accelerate or delay commercial construction projects.
Skilled HVAC ducting installers at work
By Paul Bondsfield June 10, 2026
Discover how managed HVAC ducting installation reduces project risk, rework and contractor management overhead. Supply, install and logistics support from one team.
SwiftSteel steel culvert
By Paul Bondsfield May 18, 2026
Compare steel, concrete and plastic culverts for NZ and Australian civil, rural and stormwater projects. Learn which delivers the best long-term value for strength, speed and durability
Remove delays on site with readily available ducting accessories
By Paul Bondsfield March 19, 2026
Discover why HVAC projects run late and how stocked ducting components and smarter supply strategies can keep construction programmes on track.
Te Kaha - Christchurch Stadium - With ALO Ducting
By Paul Bondsfield January 21, 2026
In compressed construction programmes, ducting availability and local manufacturing offer major advantages. Learn how supply reliability reduces delays and cost risks on site.
ARLO Express Sheetmetals - Brisbane
By Paul Bondsfield January 21, 2026
How to evaluate ducting partners beyond metal supply. A guide to assess technical support, documentation, testing, and on-site services for major HVAC projects.
Complex duct installation
By Paul Bondsfield January 21, 2026
Modern buildings change during construction. Learn how flexible ducting systems reduce risk, support fire safety changes, and improve installation speed.
commercial HVAC ducting
By Paul Bondsfield January 21, 2026
High-quality ducting impacts energy efficiency, comfort, fire safety, and lifecycle cost in commercial buildings. Learn what defines a performance ducting system and the standards to follow.
Show More