University of Auckland - The B507 Park West Development

February 23, 2020

The chic and modern addition to the University of Auckland, B507 Park West Development - Grafton campus, boasts a value of $100m+, spans 19,500m², and has five occupied levels

and includes a carpark, acoustic booths, teaching spaces, clinics and offices.


Express was subcontracted to Numecon Contracting to deliver the job within a tight timeframe, beginning in October 2018 and going through to February 2020.


“Establishing consistent and clear communications has ensured all aspects of this job were completed with minimum fuss and maximum accuracy. The job was modelled and provided in Revit 3D and which enabled a simple and accurate translation to manufacturing requirements. This and the timely release of high-quality mechanical drawings from Numecon via Aconnex really improved the ability to plan and manufacture this project in support of the site program and ensure manufacturing was completed accurately - first time - to very high standards”, Mike Arcari – Director Production, Express Sheetmetals.


Numecon notes that Express excels in responding to site demands in a timely manner, their QA and quality of install are top notch, and their can-do attitude is greatly appreciated.


According to Paul O’Callaghan, Director of Numecon Contracting, Express takes the initiative to use innovative technology that significantly improves accuracy and therefore efficiency.


“It was a relatively simple space-restricted project, but it had to be done fast, and the accuracy had to be there”,

explains Paul.


On Express, Paul had this to say, “They are a good company. They have good systems and good people.”


On their relationship, “It’s construction. You’re in people's faces. You’re building things. You’re under pressure to deliver. But at the end of the day, they have the right people.”


“I liken it to an old Māori proverb that goes like this:


‘He aha te mea nui o tea o? He tangata, he tangata, he tangata.


It translates to:


‘It is the people, it is the people, it is the people.’


And this explains Express Sheetmetals to a tee”, Paul finishes.


“Working in an environment where there was fantastic alignment and communication between the head contractor, the Numecon team, and ourselves has made this project a pleasure to complete. With stability in the build program, completeness of design and very strong on-site management of the mechanical aspects of the project, we were able to place additional emphasis on quality to ensure we met the very highest of customer expectations”, Sander Dales – Director Operations.

By Paul Bondsfield June 24, 2026
Discover the 7 most important custom ducting features that improve HVAC efficiency, reduce energy costs, and optimise airflow in commercial buildings.
Production facility capacity is key
By Paul Bondsfield June 23, 2026
Custom steel ducting fabrication guide for commercial HVAC contractors. Learn how to choose reliable ducting suppliers based on cost, lead times and project performance.
Commercial HVAC Installation
By Paul Bondsfield June 19, 2026
How does commercial HVAC installation affect project timelines? Learn the key factors that accelerate or delay commercial construction projects.
Skilled HVAC ducting installers at work
By Paul Bondsfield June 10, 2026
Discover how managed HVAC ducting installation reduces project risk, rework and contractor management overhead. Supply, install and logistics support from one team.
SwiftSteel steel culvert
By Paul Bondsfield May 18, 2026
Compare steel, concrete and plastic culverts for NZ and Australian civil, rural and stormwater projects. Learn which delivers the best long-term value for strength, speed and durability
Remove delays on site with readily available ducting accessories
By Paul Bondsfield March 19, 2026
Discover why HVAC projects run late and how stocked ducting components and smarter supply strategies can keep construction programmes on track.
Te Kaha - Christchurch Stadium - With ALO Ducting
By Paul Bondsfield January 21, 2026
In compressed construction programmes, ducting availability and local manufacturing offer major advantages. Learn how supply reliability reduces delays and cost risks on site.
ARLO Express Sheetmetals - Brisbane
By Paul Bondsfield January 21, 2026
How to evaluate ducting partners beyond metal supply. A guide to assess technical support, documentation, testing, and on-site services for major HVAC projects.
Complex duct installation
By Paul Bondsfield January 21, 2026
Modern buildings change during construction. Learn how flexible ducting systems reduce risk, support fire safety changes, and improve installation speed.
commercial HVAC ducting
By Paul Bondsfield January 21, 2026
High-quality ducting impacts energy efficiency, comfort, fire safety, and lifecycle cost in commercial buildings. Learn what defines a performance ducting system and the standards to follow.
Show More