Projects

University of Auckland - The B507 Park West Development

February 23, 2020

The chic and modern addition to the University of Auckland, B507 Park West Development - Grafton campus, boasts a value of $100m+, spans 19,500m², and has five occupied levels

and includes a carpark, acoustic booths, teaching spaces, clinics and offices.


Express was subcontracted to Numecon Contracting to deliver the job within a tight timeframe, beginning in October 2018 and going through to February 2020.


“Establishing consistent and clear communications has ensured all aspects of this job were completed with minimum fuss and maximum accuracy. The job was modelled and provided in Revit 3D and which enabled a simple and accurate translation to manufacturing requirements. This and the timely release of high-quality mechanical drawings from Numecon via Aconnex really improved the ability to plan and manufacture this project in support of the site program and ensure manufacturing was completed accurately - first time - to very high standards”, Mike Arcari – Director Production, Express Sheetmetals.


Numecon notes that Express excels in responding to site demands in a timely manner, their QA and quality of install are top notch, and their can-do attitude is greatly appreciated.


According to Paul O’Callaghan, Director of Numecon Contracting, Express takes the initiative to use innovative technology that significantly improves accuracy and therefore efficiency.


“It was a relatively simple space-restricted project, but it had to be done fast, and the accuracy had to be there”,

explains Paul.


On Express, Paul had this to say, “They are a good company. They have good systems and good people.”


On their relationship, “It’s construction. You’re in people's faces. You’re building things. You’re under pressure to deliver. But at the end of the day, they have the right people.”


“I liken it to an old Māori proverb that goes like this:


‘He aha te mea nui o tea o? He tangata, he tangata, he tangata.


It translates to:


‘It is the people, it is the people, it is the people.’


And this explains Express Sheetmetals to a tee”, Paul finishes.


“Working in an environment where there was fantastic alignment and communication between the head contractor, the Numecon team, and ourselves has made this project a pleasure to complete. With stability in the build program, completeness of design and very strong on-site management of the mechanical aspects of the project, we were able to place additional emphasis on quality to ensure we met the very highest of customer expectations”, Sander Dales – Director Operations.

By Paul Bondsfield • October 12, 2026
A major Australian data centre project highlights how off-site fabrication is becoming a strategic work package in mechanical contracting and construction delivery.
By Paul Bondsfield • September 22, 2026
Discover why early HVAC design decisions, better coordination and off-site manufacturing can reduce rework, improve productivity and help deliver better buildings.
SwiftSteel Pile Liners
By Paul Bondsfield • September 4, 2026
Marine environments are harsh and unforgiving for construction. SwiftSteel pile liners can be the ideal solution combining strength, rigidity & on-site adaptability
Air distribution in Data Centres
By Paul Bondsfield • August 20, 2026
Data Centres are complex buildings so getting HVAC ducting right is critical. Six areas for mechanical contractors and duct manufacturers to be aware of for success.
New Zealand Data Centre - Auckland
By Paul Bondsfield • August 19, 2026
Explore data centre cooling from an airflow and ductwork perspective, with practical considerations for HVAC projects across New Zealand and Australia.
SPIRO Galvanised Steel HVAC Ducting
By Paul Bondsfield • August 12, 2026
Galvanised steel is most common for HVAC ducting because of all-round performance, availability, speed of production, value and adherence to industry standards
By Paul Bondsfield • August 11, 2026
What is the best material for HVAC ducting: galvanised steel, stainless steel or aluminium? It depends on the location, environment and performance requirements
ARLO SPIRO HVAC  Ducting - SMACNA & AS4254 compliant. Photographed end-on
By Paul Bondsfield • August 4, 2026
Learn how AS 4254 and SMACNA standards guide commercial HVAC ductwork manufacture and installation, and why they matter to contractors and specifiers.
Efficient HVAC Installation
By Paul Bondsfield • July 31, 2026
Choose HVAC ducting systems that install faster with less on-site assembly. Learn how commercial ducting solutions improve efficiency, reduce labour costs, and keep HVAC projects on schedule.
By Paul Bondsfield • July 29, 2026
When to use round duct, rectangular duct or oval duct on HVAC projects. The pros and cons of each shape profile
Show More